2026 Spring Services Checklist - Flipbook - Page 7
Flush and Fill Cooling System......&&&&&&&..&&&.&..&&&&...&&&&&&&. Yes
No
j Engine(s) 1 or 2
j Generator
$200.00 per hr.
Price to Be Billed Upon Completion:$_______
Change Water Pump Impeller......&&&&&&&..&&&.&..&&&&...&&&&&.&& Yes
No
j Engine(s) 1 or 2
j Generator
$200.00 per hr.
Price to Be Billed Upon Completion:$_______
Replace Engine Zincs&&&&...&&&&&&&..&&&.&..&&&&...&&&&&&& Yes
No
$200.00 per hr.
j Engine(s) 1 or 2
j Generator
Price to Be Billed Upon Completion: $________
Steering System 3 Inspect/Purge Air&.&&&&&&...&&&&&&&&&&&&&&& Yes
No
j Specify:______________________________________ $200.00 per hr.
Price to Be Billed Upon Completion: $________
Batteries 3 Install/Reconnect (Load Test, Filled w/ Water, Clean Terminals)&&&&&....& Yes
No
j Specify:______________________________________ $200.00 per hr.
Price to Be Billed Upon Completion: $________
Commission Water Systems (Check/Change Filtration If Necessary).&&...&&&&&&& Yes
No
$200.00 per hr.
j Fresh Water j Raw Water
Price to Be Billed Upon Completion: $________
Commission Sanitation System(s) 1 or 2 (Check/Change Filtration If Necessary).&&&&.... Yes
No
j Specify:______________________________________ $250.00 per hr.
Price to Be Billed Upon Completion: $________
Commission Air Conditioning System(s) 1 or 2 (Check/Change Filtration If Necessary).&&. Yes
No
j Specify:______________________________________ $250.00 per hr.
Price to Be Billed Upon Completion: $________
Fire Extinguisher/Halon System 3 Test/Certification&&&&&&&&&&&&&.............. Yes
No
j Specify:______________________________________ $200.00 per hr.
Price to Be Billed Upon Completion: $________
Life Raft 3 Service/Re-Install&&&&&&&&&&&&&&&&&&&&&&&..&&. Yes
No
j Specify:______________________________________ $200.00 per hr.
Price to Be Billed Upon Completion: $________
River Run/Sea-Trial Vessel..&&..&&&&&&...&&&&&&&&&&&&&&& Yes
No
j Specify:______________________________________ $200.00 per hr.
Price to Be Billed Upon Completion: $________
BOTTOM
New Economy Option Touchup Bottom Paint..............................................&&&...&&.. Yes
No
j Prep/Paint Bare Spots, Paint Prow & Waterline
$17.50 per ft.
Price:$_______
Bottom Painting&&&&&&&&&&&&&&.&..&&&&...&&&&&&...&&...& Yes
No
j 1 Coat
$21.00 per ft.
j 2 Coats
$26.00 per ft.
$175.00 per hr.
j Heavy Sanding
Price:$_______
Bottom Blasting & Barrier Coating.&&&&&&.&..&&&&...&&&&&&&&&....... Yes
No
j Sand Blast
j Soda Blast
j Epoxy/Fill
j Barrier Coat
àQuoted Price:$_______
Bottom Zincing 3 Remove/Replace...&&&&&.&&&&&....&&&&&&&&&......... Yes
No
j Specify:______________________________________ $200.00 per hr.
Price:$_______
Bonding System 3 Inspect/Service&...&&&&&&...&&&&&&&&&&&&&&& Yes
No
j Specify:______________________________________ $200.00 per hr.
Price to Be Billed Upon Completion: $________