2025Storage - Flipbook - Page 7
Winterize Generator...&&&&.&&&&&&&&&&.&..&&&&...&&&&&&&&. Yes
No
j Specify:_____________________________________
$200.00 per gen.
Price:$_______
Note: Winterizing Does Not Include Spring Tune-Up and Does Not Guarantee Start-Up.
Stern Drives(s) 1 or 2 (Check & Repair as Needed)&&&&...&&...&.&&.&&&&&&.. Yes No
j Change Oil in Drive(s) 1 or 2
j Remove and Store Drive(s) 1 or 2
$200.00 per hr.
Note: Does Not Include Spring Installation
Price to Be Billed Upon Completion:$_______
Change Outboard Gear Lube &&&&&&&&&&&&&&&&&&&&&&&&&&. Yes
No
$200.00 per hr.
Price to Be Billed Upon Completion: $________
Oil & Filter Change&&&&&...&&&&&&&..&&&.&..&&&&...&&&&&&&. Yes
No
j Engine(s) 1 or 2
j Generator
$200.00 per hr.
Price to Be Billed Upon Completion:$_______
Transmission Fluid & Filter Change Engine(s) 1 or 2&&&.&..&&&&...&&&&&&&. Yes
No
$200.00 per hr.
j Specify:______________________________________
Price to Be Billed Upon Completion:$_______
Fuel Filter Change..&&&&&...&&&&&&&..&&&.&..&&&&...&&&&&&&. Yes
No
j Engine(s) 1 or 2
j Generator
$200.00 per hr.
Price to Be Billed Upon Completion:$_______
Flush and Fill Cooling System......&&&&&&&..&&&.&..&&&&...&&&&&&& Yes
No
j Engine(s) 1 or 2
j Generator
$200.00 per hr.
Price to Be Billed Upon Completion:$_______
Replace Engine Zincs&&&&...&&&&&&&..&&&.&..&&&&...&&&&&&&.. Yes
No
j Engine(s) 1 or 2
j Generator
$200.00 per hr.
Price to Be Billed Upon Completion:$_______
Change Water Pump Impeller......&&&&&&&..&&&.&..&&&&...&&&&&.&& Yes
No
j Engine(s) 1 or 2
j Generator
$200.00 per hr.
Price to Be Billed Upon Completion:$_______
Batteries 3 Disconnect/Storage (Includes Trickle Charging, Re-Installation Not Included)&... Yes No
j Number of Batteries:_______________________
$100.00 ea.
Price:$_______
Decommission Water Systems&.....&&&&&&&..&&&.&..&&&&...&&&&&...& Yes No
j Ice Maker(s)/Refrigeration: ______ j Fresh Water System: ______ j Raw Water System:_____
$200.00 per hr.
Price to Be Billed Upon Completion:$_______
Decommission Sanitation System(s) 1 or 2&&&&&&&...........&&&.&&.&&&&&... Yes No
NOTE: System Must Be Pumped Out or There is a $50.00 Charge for Pump Out Service
j Specify:______________________________________
$250.00 per hr.
Price to Be Billed Upon Completion:$_______
Decommission Air Conditioning System(s) &..&..&...&&&&&&.&..&&&...&&.......... Yes No
j Specify:______________________________________
$250.00 per hr.
Price to Be Billed Upon Completion:$_______
SHRINK WRAPPING: (Note: Prices Do Not Include Removal in Spring)
Power Boats (includes venting)&&&...&&&&&&&.&&.....&&&&&&&&&....... Yes
No
Express 259 and Under: $22.00 per ft.
Express 269-359:
$24.00 per ft.
Bridge 269-359:
$26.50 per ft.
Express 369-459:
$28.00 per ft.
Bridge 369 to 459:
$30.00 per ft.
Express 469-559
$33.00 per ft.
Bridge 469-559
$35.00 per ft.
Express 569 +
àQuoted
Bridge 569 +
àQuoted
Price:$_______